top of page
OLYMPIC PARC MUNICH – GERMANY
Location: Munich, Germany
Building Developer: Free State of Bavaria, Munich State Building Authority 2
Architect: Dietrich I Untertrifaller Architekten ZT GmbH, Dornbirn (AT)
Timber Construction: Rubner Holzbau GmbH
Timber Assembly: L+S Baucon GmbH
Timber Construction – excellent
In the future, impressive wooden structures can be viewed on the TUM Campus in the olympic parc Munich. A total of 14 sports halls, 12 lecture halls, 15 laboratories, 5 workshops and 300 offices are being built here on behalf of the Free State of Bavaria. A particular eye-catcher is the 18.3 meter cantilever, which also covers the 100 meter running track.
332 m3 Cross laminated timber
11.689 m2 Roof elements
1/1
bottom of page